Legislación / ID#14-279

* RESOLUCIÓN del Consejo de la Ciudad de Fresno que adopta la Segunda Enmienda a la Resolución de Asignación Anual No. 2014-95 para asignar $900,000 en el Fondo A-1 del Bono de Ingresos del Agua de 2010 para la Adquisición de Servidumbres de Derecho de Vía Permanentes para Tuberías y Servidumbres de Construcción Temporales para la Construcción de la Tubería de Agua Cruda desde el Canal Friant-Kern hasta la Instalación de Tratamiento de Agua Superficial del Noreste (requiere 5 votos afirmativos)

ID#14-279 · Action Item · Passed

Traducido automáticamente. Es posible que parte del contenido aún no esté disponible en este idioma.

Presentado por
City Council
Fecha
Thu, Aug 28, 2014
Resultado
Thu, Aug 28, 2014
#
RESO 2014-142

Texto completov1

REPORT TO THE CITY COUNCIL August 28, 2014 FROM: THOMAS C. ESQUEDA, Director Department of Public Utilities THROUGH: MARTIN A. QUERIN, PE, Assistant Director Department of Public Utilities - Water Division BY: HENRY McLAUGHLIN, Management Analyst III Department of Public Utilities - Water Division SUBJECT ..Title * RESOLUTION of the Council of the City of Fresno Adopting the 2nd Amendment to the Annual Appropriation Resolution No. 2014-95 to appropriate $900,000 in the 2010 Water Revenue Bond A-1 Fund for the Acquisition of Permanent Pipeline Right-of-Way Easement and Temporary Construction Easements for the Construction of the Raw Water Pipeline from the Friant-Kern Canal to the Northeast Surface Water Treatment Facility (requires 5 affirmative votes) ..Body RECOMMENDATION Adopt a Resolution of the Council of the City of Fresno adopting the 2nd Amendment to the Annual Appropriation Resolution No. 2014-95. EXECUTIVE SUMMARY The Department of Public Utilities, Water Division, is finalizing the design of the Friant-Kern Raw Water Pipeline to deliver raw water from the Friant-Kern Canal to the Northeast Surface Water Treatment Facility (NESWTF). With bidding scheduled to begin in early 2015, acquisition of easements for this pipeline project is necessary. Funding for this expenditure was included as part of the FY 2014 Budget within the 2010 Water Revenue Bond A-1 Fund and it was estimated that the funds would be spent last fiscal year. However, no payments were made for the easements during FY 2014, so the funds are required to be carried over and appropriated for FY 2015. BACKGROUND Presently, the City's contracted delivery of surface water with the United States Bureau of Reclamation (USBR) for Central Valley Project (CVP) travels nearly 55 miles in open canals from Friant Dam (Millerton Lake) to the NESWTF. This water is susceptible to contamination from environmental debris, and accidental or malicious acts. The proposed project consists of the construction and operation of a 5.6-mile raw water pipeline (the first one-mile long segment of pipeline extending north from the NESWTF was constructed in 2007) that reroutes the CVP water directly to the NESWTF. This will eliminate nearly 47 miles from the conveyance distance and deliver water in an enclosed system that will greatly reduce the threat to water quality. Additional benefits of the project include reduced power consumption and chemical utilization, and increased operational reliability at the NESWTF. Project construction is expected to start in early 2015. As the pipeline will be constructed across numerous properties in unincorporated Fresno County, the acquisition of numerous permanent pipeline right-of-way easement and temporary construction easements is required. The funding for the acquisition payments was included in the FY 2014 Budget within the 2010 Water Revenue Bond A-1 Fund and it was estimated that the funds would be expended before the end of the fiscal year. However, there were delays in securing required regulatory permits and the expenditures were not made as planned in FY 2014, so the funds will need to be carried over to the FY 2015 Amended Budget. ENVIRONMENTAL FINDINGS This is not a "project" for purposes of California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15378(b)(4), as it is a government fiscal activity, and section 15378(b)(5), as it is an administrative activity that will not result in direct or indirect physical changes to the environment. LOCAL PREFERENCE Local preference was not implicated because no construction or services contract was awarded. FISCAL IMPACT This action will not have any impact to the General Fund or the Water Enterprise Fund. Appropriations for the acquisition of these easements were included in the Division's FY 2014 Capital Improvement Program budget within the 2010 Water Revenue Bond A-1 Fund (40118). However, this funding was not used in FY 2014 and is being reappropriated to FY 2015 through this action. The debt service for these bonds was included in the 2006 rate plan adopted by Council on February 27, 2007, and was carried forward in the rate plan adopted by the Council on August 15, 2013, through Resolution No. 2013-143. Attachment: 2nd Amendment to the Annual Appropriation Resolution No. 2014-95

Patrocinadores

Historial

FechaÓrganoAcciónResultado
Thu, Aug 28, 2014City CouncilADOPTEDPass

Documentos adjuntos