Acciones relacionadas con el Proyecto de sincronización de señales de tráfico inalámbricas del Sistema de transporte inteligente de West Avenue (“ITS”) desde McKinley Avenue hasta Herndon Avenue - Archivo de licitación 3345 (Distritos 1, 2 del consejo y condado de Fresno) 1. Adoptar un hallazgo de exención categórica según la determinación del personal, de conformidad con la Sección 15301(c) de las Directrices CEQA para el Proyecto inalámbrico ITS de West Avenue desde McKinley Avenue hasta Herndon Avenue. 2. Adjudicar un contrato de construcción a Crosstown Electrical and Data, Inc. de Irwindale, California por un monto de $296,475 para el proyecto inalámbrico ITS de West Avenue desde McKinley Avenue hasta Herndon Avenue.

ID#15-251 · Action Item · Passed

Traducido automáticamente. Es posible que parte del contenido aún no esté disponible en este idioma.

Presentado por
City Council
Fecha
Thu, Apr 9, 2015
Resultado
Thu, Apr 9, 2015

Texto completov1

REPORT TO THE CITY COUNCIL April 9, 2015 FROM: SCOTT L. MOZIER, PE, Director Public Works Department THROUGH: ROBERT N. ANDERSEN, PE, Assistant Director Public Works Department, Capital Management Division LAL GOONAWARDENA, PE, Design Services Manager Public Works Department, Capital Management Division BY: BRYAN DOI, Engineer II Public Works Department, Capital Management Division SUBJECT ..Title Actions pertaining to the West Avenue Intelligent Transportation System ("ITS") Wireless Traffic Signals Synchronization Project from McKinley Avenue to Herndon Avenue - Bid File 3345 (Council Districts 1, 2 and Fresno County) 1. Adopt a finding of Categorical Exemption per staff determination, pursuant to Section 15301(c) of the CEQA Guidelines for the West Avenue ITS Wireless Project from McKinley Avenue to Herndon Avenue 2. Award a construction contract to Crosstown Electrical and Data, Inc. of Irwindale, California in the amount of $296,475 for the West Avenue ITS Wireless Project from McKinley Avenue to Herndon Avenue ..Body RECOMMENDATIONS Staff recommends that the City Council adopt a finding of Categorical Exemption per staff determination, pursuant to Section 15301(c) of the CEQA Guidelines, and award a construction contract to Crosstown Electrical and Data, Inc. of Irwindale, California in the amount of $296,475 as the lowest responsive and responsible bidder for the West Avenue ITS Wireless Project from McKinley Avenue to Herndon Avenue and authorize the Public Works Director or designee to sign the contract on behalf of the City. EXECUTIVE SUMMARY The West Avenue traffic signals synchronization project will install a wireless communication system to interconnect the traffic signal controllers along West Avenue and synchronize the corridor. This project will result in a responsive, efficient and coordinated system, improving safety, operations, energy conservation, air quality and effective capacity of the West Avenue corridor, while reducing emissions and improving overall quality of life. BACKGROUND West Avenue is a major north-south corridor through Fresno that intersects all east-west arterial streets between McKinley Avenue and Herndon Avenue. This corridor funnels traffic onto major arterials as well as provides access to local businesses within the City of Fresno. The signalized intersections along West Avenue operate independently, reducing the efficiency of the corridor and contributing to congestion and higher emissions during the peak hours. The proposed ITS Project will install wireless communication and interconnect the traffic signal controllers for an efficient traffic responsive coordination system, improving safety, operations, energy conservation and effective capacity of the corridor while reducing emissions and improving overall quality of life. Staff prepared bid documents with a scope that included a wireless communication system, state-of-the-art traffic signal controllers, cabinets, and advanced technologies to synchronize the West Avenue corridor from McKinley Avenue to Herndon Avenue. The Notice Inviting Bids was published in the Business Journal on January 28, 2015, and posted on the City's website and faxed to ten (10) building exchanges. The specifications were distributed to nine (9) prospective bidders. Four (4) sealed bid proposals were received and opened in a public bid opening on February 24, 2015. Bids ranged from $296,475 to $533,660. Crosstown Electrical and Data, Inc., which submitted the bid in the amount of $296,475, was determined to be the lowest responsive and responsible bidder for the project. The bids will expire in 64 days from the bid opening date on April 29, 2015. Staff is recommending that the Council award a construction contract to Crosstown Electrical and Data, Inc. of Irwindale, California in the amount of $296,475 for the West Avenue ITS Wireless Project from McKinley Avenue to Herndon Avenue as the lowest responsive and responsible bidder and to authorize the Public Works Director or designee to sign and execute the standardized contract on behalf of the City of Fresno. ENVIRONMENTAL FINDINGS Staff has performed a preliminary environmental assessment of this project and has determined that it falls within the Categorical Exemption set forth in CEQA Guidelines Section 15301(c) (existing facilities) which exempts projects involving a negligible or no expansion of an existing facility. This exemption applies because this project involves improving efficiency of an existing roadway through coordinating the operation of existing traffic signals to reduce congestion without expansion of the roadway. The relatively small transmitters will be mounted on existing signal mast arms; wiring is run in existing conduit and signal cabinets; and existing cabinets will be replaced without expanding the current space. Staff determined under the CEQA Guidelines this project fits within the definition of existing facilities in Section15301(c) Class 1, as Categorically Exempt from further CEQA review. Furthermore, Staff has determined that none of the exceptions to Categorical Exemptions set forth in the CEQA Guidelines, Section 15300.2 apply to this project. LOCAL PREFERENCE The local preference was not implemented based on conditions of the Federal Congestion Mitigation Air Quality ("CMAQ") grant. FISCAL IMPACT The project is located in Council Districts 1, 2 and Fresno County. The overall cost of the project is $482,400 and is funded by $386,499 in CMAQ Regional Bid funds and $95,901 in Proposition 111 Gas Tax funds. The project will not have any impact to the General Fund. Of the overall budget of the project, $296,475 will be used for the construction contract award. Attachments: Bid Evaluation Fiscal Impact Statement Vicinity Map

Patrocinadores

Historial

FechaÓrganoAcciónResultado
Thu, Apr 9, 2015City CouncilAPPROVEDPass