Legislación / ID17-1586

***RESOLUCIÓN - Primera Enmienda a la Resolución de Asignación Anual (AAR) No. 2017-165 que asigna $175,000 para el alumbrado público del estadio a lo largo de Bulldog Lane y Millbrook Avenue (Distrito 4 del Concejo) (Requiere 5 votos afirmativos) (Sujeto al veto del Alcalde)

ID17-1586 · Action Item · Passed

Traducido automáticamente. Es posible que parte del contenido aún no esté disponible en este idioma.

Presentado por
City Council
Fecha
Thu, Dec 7, 2017
Resultado
Thu, Dec 7, 2017
#
2017-323

Texto completov1

REPORT TO THE CITY COUNCIL December 7, 2017 FROM: SCOTT L. MOZIER, PE, Director Public Works Department BY: RANDALL MORRISON, PE, Assistant Director Public Works Department, Engineering Division SUBJECT ..Title ***RESOLUTION - 1st Amendment to the Annual Appropriation Resolution (AAR) No. 2017-165 appropriating $175,000 for Stadium Street Lighting along Bulldog Lane and Millbrook Avenue (Council District 4) (Requires 5 affirmative votes) (Subject to Mayor's veto) ..Body RECOMMENDATION Staff recommends that the City Council adopt the 1st Amendment to the Annual Appropriation Resolution No. 2017-165, to appropriate $175,000 for City design and construction costs of installing street lighting along Bulldog Lane and Millbrook Avenue adjacent to Bulldog Stadium at California State University, Fresno (Fresno State). EXECUTIVE SUMMARY Fresno State has worked in partnership with the Mayor's Office, Council District 4 and Public Works staff to develop a cooperative project for the installation of street lighting on Bulldog Lane and Millbrook Avenue adjacent to the Bulldog Stadium. With the approval of the Council, the City will receive $125,000 from Fresno State and proceed with the construction phase of the project, utilizing $50,000 in Measure "C" funds for the balance of the project costs. BACKGROUND The streets surrounding Bulldog Stadium lack street lighting along the Stadium frontage. This area is traveled by many students who live in nearby apartments and walk to and from the college, as well as community members attending events at Bulldog Stadium. Installing street lighting will greatly increase the illumination levels and improve safety in the area. Staff has received a letter of intent from Fresno State (see attached) to provide $125,000 for the construction project. The City of Fresno will contribute $50,000 of Measure "C" Flexible Funds towards the project. Staff is recommending that the City Council adopt the 1st Amendment to the Annual Appropriation Resolution No. 2017-165, to appropriate $175,000 for City design and construction costs for installing street lighting along Bulldog Lane and Millbrook Avenue adjacent to Bulldog Stadium at California State University, Fresno (Fresno State). ENVIRONMENTAL FINDINGS By the definition provided in the California Environmental Quality Act Guidelines Section 15378 this item does not qualify as a project under the California Environmental Quality Act requirements. LOCAL PREFERENCE Local preference does not apply to the project included in this report as this is a new project appropriation only. Local preference (if applicable) will be considered at the time of contract award. FISCAL IMPACT There is no new net impact to the General Fund. All proposed costs will be paid for from Fresno State's contribution and Measure "C" Flexible Funds. See attached Resolution for specific funds and associated costs. Attachments: Fresno State Letter of Intent 1st Amendment to the Annual Appropriation Resolution No. 2017-165

Patrocinadores

Historial

FechaÓrganoAcciónResultado
Thu, Dec 7, 2017City CouncilAPPROVEDPass

Documentos adjuntos