Kev cai lij choj / ID 20-00630

Pom zoo Daim Ntawv Cog Lus Hloov Daim Ntawv Cog Lus No 1, nce daim ntawv cog lus los ntawm $ 119,500, txij li $ 197,376 mus txog $ 316,876 rau Daim Ntawv Cog Lus Txog Kev Loj Hlob Ntawm Lub Nroog Fresno thiab Kev Saib Xyuas Kev Loj Hlob ntawm America dba California Highway Adoption California Highway Adoption Co.

ID 20-00630 · Action Item · Agenda Ready

Tsis siv neeg txhais lus. Qee cov ntsiab lus tseem tsis tau muaj nyob hauv hom lus no.

Taw qhia los ntawm
City Council
Hnub tim
Thu, May 21, 2020
Kev tshwm sim
Thu, May 21, 2020

Full textv1

REPORT TO THE CITY COUNCIL May 21, 2020 FROM: SCOTT L. MOZIER, PE, Director Public Works Department BY: AARON A. AGUIRRE, Public Works Manager Public Works Department, Landscape Maintenance Division SUBJECT ..Title Approve Contract Change Order No. 1, increasing the contract amount by $119,500, from $197,376 to $316,876 for the Highway Litter Control Contract between the City of Fresno and Landscape Maintenance of America dba California Highway Adoption California Highway Adoption Co. ..Body RECOMMENDATION Staff recommends City Council approve Contract Change Order No. 1, in the amount of $119,500, with Landscape Maintenance of America dba California Highway Adoption California Highway Adoption Co for the Highway Litter Control. EXECUTIVE SUMMARY On January 16, 2020, City Council approved a contract with Landscape Maintenance of America dba California Highway Adoption Co. for $197,376 to provide monthly highway litter control along California State Routes 41, 99, 168 and 180 throughout City of Fresno (City) limits. The contract change order for $119, 500 will increase litter control from (1) one time per month to (2) two times per month, for a total of (24) twenty-four times per year on Highway 41 and 99. These two highways are experiencing high volumes of litter and would benefit significantly from the extra two cycles per month. Funding is available through the freeway litter control program previously approved by the Council, which includes outside funding from Measure "C" and Caltrans District 6. BACKGROUND The City Council appropriated funds for Highway Litter Control on January 16, 2020, to Maintenance of America dba California Highway Adoption Co. In the first month, the Highway Litter Control team picked up 865 bags of litter, equating to approximately 8.65 tons, along California State Routes 41, 99, 168 and 180. Of the total 8.65 tons picked up in month one, 5.84 tons or 68% of the litter came from California State Routes 41 and 99. As such, the increase in litter removal from (1) one time per month to (2) two times per month along Highway 41 and 99 will allow for garbage to be picked up more frequently, improving the health and safety and the appearance of our City. ENVIRONMENTAL FINDINGS Pursuant to California Environmental Quality Act (CEQA) Guidelines section 15378, this is not a project as defined by CEQA LOCAL PREFERENCE Local preference was not implemented because this change order is to an existing construction contract. FISCAL IMPACT This request will have no impact to the General Fund in the 2020 Fiscal year. All funding for the program will be available through the adopted FY2020 budget and Measure C Litter Abatement funds and Caltrans funding. Matching funds were made available from Community Sanitation Revenues in the adopted FY2020 budget. Attachment: Contract Change Order No. 1

Txhawb nqa

Keeb kwm

Hnub timLub cevKev uaKev tshwm sim
Thu, May 21, 2020City CouncilAPPROVEDPass

Cov ntawv txuas