Tso cai rau Tus Thawj Coj Saib Xyuas Kev Ua Haujlwm kom nkag mus rau hauv Daim Ntawv Pom Zoo Cooperative Project (Daim Ntawv Pom Zoo) hauv daim ntawv uas tau nthuav tawm tag nrho $6,000,000.00 nrog Fresno County Transportation Authority (FCTA); thiab tau txais Txoj Cai Lij Choj Environmental Exption ib Ntus 21080.13(a) ntawm California Public Resources Code, thiab 15282(g) ntawm California Environmental Quality Act (CEQA) Cov Lus Qhia rau Blackstone McKinley BNSF Grade Separation Project. (Cov Cheeb Tsam 1 thiab 7)

ID 20-00707 · Action Item · Agenda Ready

Tsis siv neeg txhais lus. Qee cov ntsiab lus tseem tsis tau muaj nyob hauv hom lus no.

Taw qhia los ntawm
City Council
Hnub tim
Thu, Jun 25, 2020
Kev tshwm sim
Thu, Jun 25, 2020

Full textv1

REPORT TO THE CITY COUNCIL June 25, 2020 FROM: SCOTT L. MOZIER, PE, Director Public Works Department THROUGH: ANDREW J. BENELLI, PE, City Engineer/Assistant Director Public Works Department, Traffic Operations and Planning Division BY: JESUS AVITIA, PE, Deputy City Engineer Public Works Department, Traffic Operations and Planning Division SUBJECT ..Title Authorize the Public Works Director to enter into a Cooperative Project Agreement (Agreement) in the form presented totaling $6,000,000.00 with the Fresno County Transportation Authority (FCTA); and adopt a Statutory Environmental Exemption per Sections 21080.13(a) of the California Public Resources Code, and 15282(g) of the California Environmental Quality Act (CEQA) Guidelines for the Blackstone McKinley BNSF Grade Separation Project. (Council Districts 1 and 7) ..Body RECOMMENDATIONS Staff recommends that the Council adopt the following recommendations: 1. Adopt a Statutory Environmental Exemption per Sections 21080.13(a) of the California Public Resources Code, and 15282(g) of the California Environmental Quality Act (CEQA) Guidelines for the Blackstone McKinley BNSF Grade Separation Project. 2. Approve the attached Agreement in the form presented between the City of Fresno and FCTA for $6,000,000.00 for the Plans, Specifications & Engineering (PS&E) Phase of the Blackstone McKinley BNSF Grade Separation Project, and authorize the Public Works Director to execute the agreement. EXECUTIVE SUMMARY On April 22, 2020, the FCTA Board approved the conversion of the Measure "C" Alternative Transportation Program into a Grade Separation Program (GSP), consistent with provisions of the 2006 Measure "C" Expenditure Plan, and selected the Blackstone McKinley BNSF grade separation project for funding through the GSP. The Blackstone McKinley BNSF Grade Separation project will eliminate two existing at-grade crossings by grade separating N. Blackstone Avenue and E. McKinley Avenue under the BNSF Mainline Track. The Blackstone and McKinley project location has experienced the highest traffic volumes and number of accidents of any at-grade crossing on the BNSF corridor, and has been deemed the highest priority location for Measure "C" grade separation funding. The project will require right-of-way acquisition and utility relocation prior to grade separation construction. The project will also be compatible and complementary to the "Better Blackstone" Initiative, and the South Blackstone Smart Mobility Strategy. On-time service performance for the City's Bus Rapid Transit Service and circulation near Fresno City College will be dramatically improved by eliminating delays due to train blockage. Sounding of train horns will also be unnecessary in the future with construction of the grade separation. Approval of the Agreement will allow reimbursement for eligible project costs by the FCTA. BACKGROUND The City has long-planned for future grade separations at locations with high traffic volumes, such as the BNSF crossing at Shaw Avenue which was grade-separated nearly 20 years ago. In the early 1970s, the City prepared a grade separation study including many citywide locations such as Blackstone Avenue and McKinley Avenue. In FY2020, staff completed an update of the Blackstone and McKinley grade separation feasibility study. The 2006 Measure "C" Expenditure Plan included a percentage of the transportation sales tax revenue to be dedicated to Rail Consolidation, under the Alternative Transportation Program, created to provide funding toward the relocation of the BNSF Railroad from its existing alignment to the Union Pacific Railroad alignment located near Golden State Boulevard. The 2006 Expenditure Plan expressly provided that if Rail Consolidation proved infeasible, ATP funding was to be utilized to construct grade separations that coordinated with transit, and provided the greatest public benefit in terms of improvement to air quality and reduction in traffic congestion. At their April 22, 2020 meeting, the FCTA Board approved the conversion of the Measure "C" ATP Rail Consolidation Program to a Measure "C" Grade Separation Program and selected the Blackstone McKinley BNSF grade separation project as the highest priority project. The FCTA Board approved the award of funding, but a Cooperative Project Agreement is necessary for the City to receive reimbursement of eligible project costs. Council approval will in turn allow the FCTA and the City to execute the Agreement. The project benefits are significant due to the high traffic volumes at these locations: � Blackstone Avenue weekday Average Daily Traffic (ADT) is 17,283, including 221 passenger buses and 21 school buses. � McKinley Avenue weekday ADT is 13,440, including 65 passenger buses and 47 school buses. � Blackstone and McKinley Avenue weekday average train crossings are 39. The high passenger bus count on the Blackstone Avenue Corridor is attributed to the City's Bus Rapid Transit system, which provides services every 10 minutes to accommodate the public's need to move between Downtown Fresno and North Fresno. The Blackstone Avenue Corridor is also part of the Smart Mobility Plan providing Class IV protected bike lanes along Blackstone Avenue through the project area. The school bus count along McKinley Avenue is attributed to the three high schools, and two elementary schools within a half-mile radius of the at grade crossings. In addition to having numerous entrances to local streets, there are multiple parking lot entrances to support Fresno City College adjacent to the BNSF Mainline, and McKinley/SR41 interchange one mile east of the at grade crossings. Additionally, Blackstone Avenue and McKinley Avenue serve as primary routes by emergency vehicles, and future in-route delays are expected due to the increased traffic and housing development taking place in the vicinity. The closest grade separation, Wishon Avenue, creates a rerouting of traffic by at least 1.5 miles and does not have the capacity to serve the public need for first responders, pedestrians, bicyclists, and vehicle traffic. Alternative routes along Clinton Avenue and Shields Avenue currently function as existing at-grade crossings. The City Attorney's Office has reviewed the Agreement as to form. ENVIRONMENTAL FINDINGS This project is statutorily exempt per Sections 21080.13(a) of the California Public Resources Code, and 15282(g) of the California Environmental Quality Act (CEQA) Guidelines. LOCAL PREFERENCE Local preference is not applicable because the Cooperative Project Agreement does not include a bid or award of a construction or service contract. FISCAL IMPACT This request will have no impact to the General Fund. All project costs for the engineering design phase will be paid by Measure "C" Grade Separation Program funds. Attachments: Blackstone McKinley Project Cooperative Agreement Statutory Exemption Vicinity Map

Txhawb nqa

Keeb kwm

Hnub timLub cevKev uaKev tshwm sim
Thu, Jun 25, 2020City CouncilAPPROVED