Muab daim ntawv cog lus kev pab tswv yim rau AM Consulting Engineers, Inc., los muab kev pabcuam engineering rau 2-Water Booster Pump Station Redundancy Txhim Kho ntawm Lub Tsev Haujlwm Saib Xyuas Dej Hauv Cheeb Tsam rau tus nqi tsis pub tshaj $ 187,590, suav nrog $ 18,000 qhov xwm txheej (Bid File 311300) District

ID 23-415 · Action Item · Passed

Tsis siv neeg txhais lus. Qee cov ntsiab lus tseem tsis tau muaj nyob hauv hom lus no.

Taw qhia los ntawm
City Council
Hnub tim
Thu, Apr 20, 2023
Kev tshwm sim
Thu, Apr 20, 2023

Full textv1

REPORT TO THE CITY COUNCIL FROM: BROCK D. BUCHE, PE, PLS, Director Department of Public Utilities BY: JESUS A. GONZALEZ, PE, Assistant Director Department of Public Utilities - Utilities Planning & Engineering SARAH AGUILA, Supervising Engineering Technician Department of Public Utilities - Utilities Planning & Engineering SUBJECT ..Title Award a consultant services agreement to AM Consulting Engineers, Inc., to provide engineering services for the 2-Water Booster Pump Station Redundancy Improvements at the Regional Wastewater Reclamation Facility for an amount not to exceed $187,590, inclusive of a $18,000 contingency (Bid File 12300511-1) (Council District 3) ..Body RECOMMENDATION Staff recommends that City Council award a consultant services agreement to AM Consulting Engineers, Inc., in the amount not to exceed $187,590, inclusive of a $18,000 contingency, to provide design, bidding, and construction support services for the 2-Water Booster Pump Station Redundancy Improvements at the Regional Wastewater Reclamation Facility (Project); and authorize the Director of Public Utilities, or designee, to sign the agreement on behalf of the City of Fresno (City). EXECUTIVE SUMMARY The Regional Wastewater Reclamation Facility (Facility) relies on untreated non-potable water (2-water) production and conveyance for the functionality of critical equipment. After a competitive consultant selection process, the Department of Public Utilities, Wastewater Management Division, is seeking to award a consultant services agreement (Agreement) for the Project to evaluate the existing 2-water pump station, design a redundant system, and provide bidding and construction support services for the Project, for an amount not to exceed $187,590, inclusive of an $18,000 contingency. BACKGROUND The 2-water booster pump station is a critical system at the Facility as it provides water to the mechanical pumps, raw sewage pumps and heat exchangers and serves as a large source of non-potable cleaning water. When the 2-water booster pumps are out of service, the Facility's operations are susceptible to interruption and reliant equipment are susceptible to permanent damage. A redundant system to the current 2-water booster pump station would allow for continuous operations as well as allow staff to perform more regular routine service and maintenance of 2-water booster pump station components, thereby extending their useful life. This Project will evaluate the existing 2-water pump station, perform a hydraulic analysis downstream of the booster pumps, propose various configurations for a redundant system, and result in the design documents necessary for bidding and construction. In accordance with Fresno Municipal Code Chapter 4, Article 1, and Administrative Order 6-19 (AO 6-19), the Department of Public Utilities conducted a competitive process to select a consultant to provide design services for the Project. A Request for Qualifications (RFQ) was published in the Business Journal and posted on Planet Bids on October 21, 2022. On November 18, the City received two Statement of Qualifications (SOQ) packages from prospective consultants. Pursuant to AO 6-19, the RFQ required the consultants to provide detailed information regarding the experience of the firm and proposed team along with additional project related scope items necessary to perform the requested services. Upon review of the received SOQs and based upon established criteria and the proposed fee, AM Consulting Engineers, Inc., was selected as the firm providing the best value for the requested services. The services rendered under this Agreement will be completed for an amount not to exceed $187,590, inclusive of an $18,000 contingency, paid on a time and materials basis. The funding for this Project is included in the Fiscal Year 2023 capital improvement budget within the Wastewater Management Division's Sewer Enterprise Fund 40501. A standardized Agreement has been used in accordance with Administrative Order 4-4, and the consultant's Certificates of Insurance have been approved by the City's Risk Management Division. Upon approval by the City Council, the Agreement will be executed by the Director of Public Utilities, or his designee. ENVIRONMENTAL FINDINGS By the definition provided in the California Environmental Quality Act (CEQA) Guidelines Section 15378, the award of this Agreement for the design services does not qualify as a "Project" for the purposes of CEQA. LOCAL PREFERENCE Local preference pursuant to the Fresno Municipal Code Section 4-109(b) was implemented by extending a 5% preference to AM Consulting Engineers, Inc., which provided certification as a local business. The 5% preference was incorporated into the evaluation criteria for the SOQs. The other prospective consultant did not provide certification as a local business and did not receive the 5% preference during the SOQ evaluations. FISCAL IMPACT There is no impact to the General Fund. Funding for this Project is included in the Fiscal Year 2023 capital improvement budget within the Wastewater Management Division's Sewer Enterprise Fund 40501. The Project is located in Council District 3. Attachment 1 - Consultant Services Agreement

Txhawb nqa

Keeb kwm

Hnub timLub cevKev uaKev tshwm sim
Thu, Apr 20, 2023City CouncilADOPTEDPass

Cov ntawv txuas