Kev cai lij choj / ID17-445
Cov kev ua cuam tshuam txog kev kho kom rov zoo li qub 16-Inch Diameter rau 460 Feet Deep ntawm Pump Station 150, nyob ntawm 1348 E. Teague Avenue, Fresno, California (Council District 6): 1. Ua raws li qhov kev tshawb pom ntawm Chav Kawm 1 Categorical Exemption tau teev tseg hauv California Environmental Quality Act Guidelines, Section 15301(b). 2. Muab daim ntawv cog lus ntawm $104,062.50 rau Anderson Pump Company, Inc., (Bid File 3517).
Tsis siv neeg txhais lus. Qee cov ntsiab lus tseem tsis tau muaj nyob hauv hom lus no.
- Taw qhia los ntawm
- City Council
- Hnub tim
- Thu, Apr 6, 2017
- Kev tshwm sim
- Thu, Apr 6, 2017
Full textv1
REPORT TO THE CITY COUNCIL
April 6, 2017
FROM: THOMAS C. ESQUEDA, Director
Department of Public Utilities
BY: MICHAEL CARBAJAL, Planning Manager
Department of Public Utilities - Water Division
CYNTHIA FISCHER, Project Manager
Department of Public Utilities - Water Division
SUBJECT
..Title
Actions pertaining to rehabilitating a 16-Inch Diameter Well to 460 Feet Deep at Pump Station 150, located at 1348 E. Teague Avenue, Fresno, California (Council District 6):
1. Adopt a finding of Class 1 Categorical Exemption set forth in the California Environmental Quality Act Guidelines, Section 15301(b).
2. Award a contract in the amount of $104,062.50 to Anderson Pump Company, Inc., (Bid File 3517).
..Body
RECOMMENDATIONS
Staff recommends that Council adopt finding of Class 1 Categorical Exemption set forth in the California Environmental Quality Act Guidelines (CEQA), Section 15301(b); award a construction contract in the amount of $104,062.50 to Anderson Pump Company, Inc. to rehabilitate a 16-inch diameter well at Pump Station 150 (PS 150); and authorized the Director of Public Utilities, or designee, to sign the contract on the City's behalf.
EXECUTIVE SUMMARY
The Department of Public Utilities, Water Division, solicited contractor services to rehabilitate a 16-inch diameter well. Anderson Pump Company, Inc., was found to be the lowest responsive and responsible bidder with a bid amount of $104,062.50. The rehabilitation of this well is expected to bring production back up to its originally rated 850 gallons per minute (gpm). Funding for this contract was included in the Fiscal Year 2017 budget.
BACKGROUND
The Department of Public Utilities, Water Division, maintains a network of 260 plus municipal water supply wells providing approximately 88% of the City's potable water. PS 150 is a 16-inch diameter well that was drilled in 1999 at a depth of 460 feet. It currently produces far below its original capacity of 850 gpm and a well video has shown that there is severe plugging in the perforations. By rehabilitating this well, it is expected that it can be restored close to full capacity of 850 gpm.
A Notice Inviting Bids was published on January 25, 2017, per the City of Fresno Charter Section 1208. Thirty-one (31) Building Exchanges were faxed the Notice Inviting Bids, and specifications were distributed to prospective bidders. A public bid opening was on February 28, 2017. There were a total of ten (10) bidders and Anderson Pump Company, Inc., was considered the lowest responsive and responsible bidder.
ENVIRONMENTAL FINDINGS
Staff has performed a preliminary environmental assessment of this project and has determined that it falls within the Class 1 Categorical Exemption set forth in CEQA Guidelines, Section 15301(b), as this contract is for the rehabilitation of the existing well at PS 150 located at 1348 E. Teague Avenue and will not result in the expansion of capacity of the existing well. Furthermore, none of the exceptions to the Categorical Exemptions set forth in the CEQA Guidelines, Section 15300.2 apply to this project.
LOCAL PREFERENCE
Local preference was not implemented because the local business exceeds the allowable local preference percentage.
FISCAL IMPACT
The project, which is located in Council District 6, will not have any impact to the General Fund. Funds for this project are included in the Water Division's Fiscal Year 2017 Capital Improvement Program budget within the Water Enterprise Fund (40101). No additional funding is required for this project.
Attachments:
Bid Evaluation/Fiscal Impact
Sample Contract
Txhawb nqa
- Department of Public Utilities
Keeb kwm
| Hnub tim | Lub cev | Kev ua | Kev tshwm sim |
|---|---|---|---|
| Thu, Apr 6, 2017 | City Council | APPROVED | Pass |
Cov ntawv txuas
- 3517BidEval.pdfuntagged
- Sample contract Pump Station 150.pdftagged