Kev nqis tes ua cuam tshuam txog Qhov Chaw Hluav Taws Xob No. 20 Remodel project (Lub Nroog Fresno): 1. ***RESOLUTION - 52nd amendment to the Annual Appropriation Resolution (AAR) No. 2016-118, to appropriate $887,100 to fully fund the Fire Station No. 20 Remodel project (Requires 5 affirmative votes) 2. Txais yuav nrhiav tau ib qho kev zam raws li Tshooj 15301(a) ntawm California Environmental Quality Act (CEQA) Guidelines 3. Grant BC Kev Tsim Kho & Kev Siv Hluav Taws Xob los ntawm lawv qhov kev sib tw raws li Public Contract Code (PCC) 5103. 4. Muab daim ntawv cog lus tsim kho nrog Divcon, Inc. ntawm Clovis, CA, rau $ 742,039

ID17-491 · Action Item · Passed

Tsis siv neeg txhais lus. Qee cov ntsiab lus tseem tsis tau muaj nyob hauv hom lus no.

Taw qhia los ntawm
City Council
Hnub tim
Thu, May 11, 2017
Kev tshwm sim
Thu, May 11, 2017
#
RESO 2017-131

Full textv1

REPORT TO THE CITY COUNCIL May 11, 2017 FROM: SCOTT L. MOZIER, P.E., Director Public Works Department BY: ROBERT N. ANDERSEN, P.E., Assistant Director Public Works Department, Capital Management Division DEBBIE BERNARD, Project Manager Public Works Department, Facilities Management Division SUBJECT ..Title Actions pertaining to the Fire Station No. 20 Remodel project (County of Fresno): 1. ***RESOLUTION - 52nd amendment to the Annual Appropriation Resolution (AAR) No. 2016-118, to appropriate $887,100 to fully fund the Fire Station No. 20 Remodel project (Requires 5 affirmative votes) 2. Adopt finding of a categorical Exemption pursuant to Section 15301(a) of the California Environmental Quality act (CEQA) Guidelines 3. Grant BC Construction & Electric relief from their bid pursuant to Public Contract Code (PCC) 5103. 4. Award a construction contract with Divcon, Inc. of Clovis, CA, for $742,039 ..Body RECOMMENDATIONS Staff recommends that Council adopt the 52nd Amendment to the Annual Appropriation Resolution (AAR) No. 2016-118, adopt a finding of a Categorical Exemption, grant relief to BC Construction and award a construction contract with Divcon, Inc., for $742,039 for the Fire Station No. 20 Remodel project and authorize the Public Works Director or designee to sign and execute the standardized contract on behalf of the City of Fresno. EXECUTIVE SUMMARY The Fig Garden Fire Protection District has been serving the area since Fire Station No. 20 was built in 1942. The station is in desperate need of upgrades to allow firefighters to perform their duties in a much more safe and efficient manner. This construction contract with Divcon, Inc., will allow Fire Station No. 20 to be brought up to current Fire department standards as much as possible. BACKGROUND Fire Station No. 20 was built in 1942 and is in desperate need of upgrades to allow Fire personnel to perform their duties in a much more safe and efficient manner. There have been additions and modifications made to the station throughout its history which are now incompatible with daily activities and duties of the firefighters. Fire Department staff entered into an agreement for consultant services on behalf of the City of Fresno for the design and preparation of construction documents for the Fire Station No. 20 remodel project. Plans and specifications were prepared by Dale Rutherford Architecture. A Notice Inviting Bids was published on February 22, 2017, distributed to ten building exchanges and posted on the City's website. The specifications were distributed to eight prospective bidders. Five sealed bid proposals were received and opened in a public bid opening on March 7, 2017, with the bid amounts ranging from $426,664 to $759,500. The apparent low bidder, BC Construction & Electric, submitted a request to withdraw their bid in accordance with Public Contract Code 5103. The bidder mistakenly left off two major components of the project in their bid, making their bid materially different than intended. The mistake was made in filling out the bid and not due to error in judgment. Staff is recommending that Council adopt the 52nd Amendment to the AAR No. 2016-118, adopt finding of a Categorical Exemption, grant BC Construction & Electric relief from their bid and award the construction contract to Divcon, Inc., of Clovis, CA, for $742,039 for the Fire Station No. 20 Remodel and authorize the Public Works Director or designee to sign and execute the standardized contract on behalf of the City of Fresno. ENVIRONMENTAL FINDINGS Staff has determined that a Categorical Exemption is appropriate, based on Class 1 Section 15301(a) of the CEQA Guidelines, which exempts interior or exterior alterations involving such things as interior partitions, plumbing, and electrical conveyances. Furthermore, staff has determined that none of the exceptions to Categorical Exemptions set forth in the CEQA Guidelines, Section 15300.2 apply to this project. Staff recommends that the Council, based upon its own independent judgment, adopt a finding of a Categorical Exemption per Staff determination, pursuant to Section 15301(a), Class 1 of the CEQA Guidelines for the Fire Station No. 20 Remodel Project. LOCAL PREFERENCE Local preference was not utilized as the apparent low bidder, after the release of BC Construction's bid, is a local business. FISCAL IMPACT The Fire Station No. 20 Remodel project is being fully funded by the Fig Garden Fire Protection District; no General Funds will be used. Attachments: 52nd Amendment to AAR No. 2016-118 Bid Relief Letter Bid Evaluation Fiscal Impact Statement Standard Contract

Txhawb nqa

Keeb kwm

Hnub timLub cevKev uaKev tshwm sim
Thu, May 11, 2017City CouncilAPPROVEDPass

Cov ntawv txuas