Kev nqis tes ua ntsig txog kev teeb tsa dej hauv Maroa Avenue ntawm Olive Avenue mus rau McKinley Avenue - Bid File 3357 (Council District 1) 1. Ua raws li qhov kev tshawb pom ntawm Chav Kawm 2 Kev zam tshwj xeeb raws li tau teev tseg hauv California Environmental Quality Act (CEQA) Cov Lus Qhia, Tshooj 15302(c) 2. Muab daim ntawv cog lus tsim kho hauv tus nqi ntawm $549,690 rau West Valley Construction Company, Inc., ntawm Fresno, California uas yog tus neeg ua haujlwm qis tshaj plaws thiab muaj lub luag haujlwm rau kev tsim kho ntawm Maroa Avenue water main thiab tso cai rau Public Works Director lossis tus tsim los kos npe rau daim ntawv cog lus tsim qauv sawv cev ntawm Lub Nroog Fresno.

ID17-884 · Action Item · Passed

Tsis siv neeg txhais lus. Qee cov ntsiab lus tseem tsis tau muaj nyob hauv hom lus no.

Taw qhia los ntawm
City Council
Hnub tim
Thu, Jun 22, 2017
Kev tshwm sim
Thu, Jun 22, 2017

Full textv1

REPORT TO THE CITY COUNCIL June 22, 2017 FROM: SCOTT L. MOZIER, PE, Director Public Works Department BY: ROBERT N. ANDERSEN, PE, Assistant Director Public Works Department, Capital Management Division RANDY BELL, PE, Capital Program Manager Public Works Department, Capital Management Division SUBJECT ..Title Actions pertaining to the installation of water mains in Maroa Avenue from Olive Avenue to McKinley Avenue - Bid File 3357 (Council District 1) 1. Adopt a finding of Class 2 Categorical Exemption as set forth in California Environmental Quality Act (CEQA) Guidelines, Section 15302(c) 2. Award a construction contract in the amount of $549,690 to West Valley Construction Company, Inc., of Fresno, California as the lowest responsive and responsible bidder for the construction of the Maroa Avenue water main and authorize the Public Works Director or designee to sign the standardized construction contract on behalf of the City of Fresno ..Body RECOMMENDATIONS Staff recommends that the City Council adopt a finding of Categorical Exemption per Staff determination pursuant to Section 15302(c) of the CEQA Guidelines and award a construction contract in the amount of $549,690 to West Valley Construction Company, Inc., of Fresno, California (West Valley) as the lowest responsive and responsible bidder for the construction of the Maroa Avenue water main and authorize the Public Works Director or designee to sign the standardized construction contract on behalf of the City of Fresno. EXECUTIVE SUMMARY The City of Fresno seeks to replace the old water mains with new mains to eliminate any failures of the deteriorated and aging water mains. The new water main will continue to provide safe drinking water, consistent water pressure and reliable water distribution and fire suppression. This project is located in Council District 1. BACKGROUND This project is in a narrow one-way road portion of N. Maroa Avenue from E. Olive Avenue to E. McKinley Avenue where the old water mains and other existing utilities are located. Due to the age of the existing water mains, numerous failures have occurred and water distribution to customers has been interrupted. This project will replace the old water mains with new mains to reduce water main failures and water distribution interruptions. The new mains will enable the City to continue to provide safe drinking water, consistent water pressure and reliable water distribution and fire suppression. The scope of work for this project includes the furnishing and installation of new pipes, complete in place with valves and other appurtenances, water services and meter boxes, water service transfers, boring or trenchless installation, trenching and trench resurfacing. The cost of this water main project is funded with the Water Division's FY 2017 Capital Improvement Project Budget within the Water Enterprise Fund. Public Works Department Staff prepared plans and specifications. A Notice Inviting Bids was advertised on March 31, 2017, in The Business Journal. Ten (10) Building Exchanges received Notices Inviting Bids and twelve (12) specifications with plan sets were distributed to prospective bidders. Six (6) sealed bid proposals were received and opened in a public bid opening on April 25, 2017, with the bids ranging from $549,690 to $654,169. Staff recommends that the Council award a construction contract in the amount of $549,690 to West Valley as the lowest responsive and responsible bidder for the installation of 8" and 10" water mains in Maroa Avenue from Olive Avenue to McKinley Avenue and authorize the Public Works Director or designee to sign the standardized construction contract on behalf of the City. The bids will expire on June 28, 2017 or within 64 days from date bids are opened. ENVIRONMENTAL FINDINGS Staff has performed a preliminary environmental assessment of this project and has determined that this project fits within the definition of Class 2 Categorical Exemption as set forth in CEQA Guidelines, Section 15302(c), because this contract is for the replacement of existing utility systems, which will not result in the expansion of capacity of existing uses and the new facilities will be on the same site as the old facilities to be replaced. Furthermore, Staff has determined that none of the exceptions to the Categorical Exemptions set forth in the CEQA Guidelines, Section 15300.2, apply to this project. LOCAL PREFERENCE Local preference was not implemented because the lowest responsive and responsible bidder is a local business. FISCAL IMPACT Funding for this water main replacement project is included in the Water Division's FY 2017 Capital Improvement Project Budget within the Water Enterprise Fund and will not have an impact on the General Fund. Attachments: Bid Evaluation Fiscal Impact Statement Vicinity Map Standard Contract

Txhawb nqa

Keeb kwm

Hnub timLub cevKev uaKev tshwm sim
Thu, Jun 22, 2017City CouncilAPPROVEDPass