Kev nqis tes ua cuam tshuam txog 4,100 linear feet ntawm cov dej hauv nruab nrab hauv North Armstrong Avenue (Council District 4 thiab County): 1. Txais qhov kev tshawb pom ntawm Tshooj 15282 (Lwm Txoj Cai Kev Zam Txim) ntawm California Environmental Quality Act Guidelines rau ib txoj haujlwm tsim kho dej tshiab hauv North Armstrong Avenue 2. *** KEV TSO CAI - 10th Hloov Kho rau Lub Xyoo Kev Tsim Kho Ib Xyoo (AAR) No. 2018-157 kom tsim nyog $984,600 los pab nyiaj rau kev teeb tsa lub hauv paus dej hauv North Armstrong Avenue (Yuav tsum muaj 5 qhov kev pov npav pov npav) (Tshwj xeeb rau tus kav nroog Veto) 3. Muab daim ntawv cog lus tsim kho rau Floyd Johnston Construction Co., Inc., nyob rau hauv tus nqi ntawm $710,994 rau dej lub ntsiab Installation project nyob rau hauv North Armstrong Avenue 4. Tso cai rau Tus Thawj Saib Xyuas Kev Siv Hluav Taws Xob, lossis tus tsim, kos npe rau daim ntawv cog lus sawv cev ntawm Lub Nroog
Tsis siv neeg txhais lus. Qee cov ntsiab lus tseem tsis tau muaj nyob hauv hom lus no.
- Taw qhia los ntawm
- City Council
- Hnub tim
- Thu, Sep 27, 2018
- Kev tshwm sim
- Thu, Sep 27, 2018
- #
- RESOLUTION 2018-235 ADOPTED
Full textv1
REPORT TO THE CITY COUNCIL
September 27, 2018
FROM: MICHAEL CARBAJAL, Director
Department of Public Utilities
THROUGH: DEJAN PAVIC, Supervising Professional Engineer
Department of Public Utilities - Utilities Planning & Engineering
BY: ROBERT A. DIAZ, Supervising Engineering Technician
Department of Public Utilities - Utilities Planning & Engineering
SUBJECT
..Title
Actions pertaining to 4,100 linear feet of water main installation in North Armstrong Avenue (Council District 4 and County):
1. Adopt findings of Section 15282 (Other Statutory Exemptions) of the California Environmental Quality Act Guidelines for a new water main Installation project in North Armstrong Avenue
2. ***RESOLUTION - 10th Amendment to the Annual Appropriation Resolution (AAR) No. 2018-157 to appropriate $984,600 to fund installation of a water main in North Armstrong Avenue (Requires 5 affirmative votes) (Subject to Mayor's Veto)
3. Award a construction contract to Floyd Johnston Construction Co., Inc., in the amount of $710,994 for water main Installation project in North Armstrong Avenue
4. Authorize the Director of Public Utilities, or designee, to sign the contract on behalf of the City
..Body
RECOMMENDATIONS
Adopt findings of Section 15282, Other Statutory Exemptions, of the California Environmental Quality Act Guidelines (CEQA); adopt the 10th Amendment to the Annual Appropriation Resolution (AAR) No. 2018-157 to appropriate $984,600 to fund installation of a water main in North Armstrong Avenue; award a construction contract to Floyd Johnston Construction Co., Inc., in the amount of $710,994 for water main installation in North Armstrong Avenue; and authorize the Director of Public Utilities, or designee, to sign the contract on behalf of the City.
EXECUTIVE SUMMARY
The Department of Public Utilities, Water Division, seeks to establish a water installation contract. The scope of work includes installation of 4,100 linear feet of water distribution main in two segments of North Armstrong Avenue. The first segment extends from East Floradora Avenue north 2,700 linear feet. The second segment extends from East Clinton Avenue 1,400 linear feet north to East Princeton Avenue. Staff recommends that City Council award a contract to Floyd Johnston Construction Co., Inc., the lowest responsive and responsible bidder, in the amount of $710,994. Funding for this contract is included in the Fiscal Year 2019 budget.
BACKGROUND
The Department of Public Utilities, Water Division, has identified that a portion of the existing water system along North Armstrong Avenue lacks water mains to provide sufficient capacity to meet the areas' water demand. Staff has determined the proposed transmission grid water main gap closure will meet and exceed the expected water demands of the surrounding area. The North Armstrong Avenue water main project includes 4,100 linear feet of 16-inch diameter pipe in North Armstrong Avenue. The first segment extends from East Floradora Avenue north 2,700 linear feet. The second segment extends from East Clinton Avenue 1,400 linear feet north to East Princeton Avenue.
On June 29, 2018, an advertisement was published inviting bids for a "Furnish and Install Contract for Water Main." Thirteen building exchanges received a fax notice inviting bids and nine specs were distributed to prospective bidders. The Purchasing Division received seven bids and on July 31, 2018 the bids were opened. Floyd Johnston Construction Co., Inc., was determined to be the lowest responsive and responsible bidder in the amount of $710,994. The other six bids ranged from $722,510 to $1,260,260. The bids received will expire 64 days after bid opening, which will be on October 3, 2018.
ENVIRONMENTAL FINDINGS
Staff has performed a preliminary environmental assessment of this project and has determined that it is exempt under Section 15282 (Other Statutory Exemptions) of the CEQA Guidelines. Section 15282 of the CEQA Guidelines includes a list of existing statutory exemptions found in the California Code. Subsection (k) of Section 15282 of the CEQA Guidelines references, the installation of new pipeline or maintenance, repair, restoration, removal, or demolition of an existing pipeline as set forth in Section 21080.21 of the Public Resources Code, as long as the project does not exceed one mile in length. The combined length of the proposed project will not exceed one mile in length. Furthermore, none of the exceptions to Categorical Exemptions set forth in the CEQA Guidelines, section 15282 apply to this project.
LOCAL PREFERENCE
Local Preference was not implemented because the low bidder qualifies as a local business pursuant to the Fresno Municipal Code Section 4-108(d).
FISCAL IMPACT
Award of this contract will not impact the General Fund and is located in Council District 4 and the County. Funding for this project is available from the appropriation of retained earnings within the Water Enterprise fund (40101) upon approval of the 10th Amendment to the AAR No. 2018-157.
Attachments:
Categorical Exemption (Attachment 1)
10th Amendment to the Annual Appropriation Resolution No. 2018-157 (Attachment 2)
Bid Evaluation and Fiscal Impact Statement (Attachment 3)
Sample Contract (Attachment 4)
Vicinity Map (Attachment 5)
Txhawb nqa
- Department of Public Utilities
Keeb kwm
| Hnub tim | Lub cev | Kev ua | Kev tshwm sim |
|---|---|---|---|
| Thu, Sep 27, 2018 | City Council | ADOPTED | Pass |
Cov ntawv txuas
- Exhibit A.pdfscanned_image
- Exhibit B.pdftagged
- Exhibit C.pdfscanned_image
- Exhibit D.pdfuntagged
- Exhibit E.pdfuntagged