Pom zoo Thib Peb Hloov Kho rau daim ntawv cog lus kws tshaj lij nrog Stantec Architecture, Inc., txhawm rau rov tsim kho 65 feem pua ​​​​cov tsheb npav hluav taws xob them nqi hluav taws xob tsim cov ntaub ntawv kom haum rau cov kev pabcuam hluav taws xob tseem ceeb los ntawm PG&E EV Fleet Program hauv tus nqi ntawm $ 73,987 thiab tso cai rau Tus Thawj Saib Xyuas Kev Thauj lossis tus neeg sawv cev los ua txhua yam ntaub ntawv ntsig txog

ID19-11470 · Action Item · Agenda Ready

Tsis siv neeg txhais lus. Qee cov ntsiab lus tseem tsis tau muaj nyob hauv hom lus no.

Taw qhia los ntawm
City Council
Hnub tim
Thu, Nov 7, 2019
Kev tshwm sim
Thu, Nov 7, 2019

Full textv1

REPORT TO THE CITY COUNCIL November 7, 2019 FROM: GREGORY A. BARFIELD, Director Department of Transportation BY: BRIAN BARR, Assistant Director Department of Transportation BRIAN CETTI, Capital Development Specialist Department of Transportation SUBJECT ..Title Approve the Third Amendment to the professional consultant agreement with Stantec Architecture, Inc., to redesign the 65 percent electric bus charging infrastructure design documents to accommodate primary electrical service through PG&E EV Fleet Program in the amount of $73,987 and authorize the Director of Transportation or designee to execute all related documents ..Body RECOMMENDATION Staff recommends Council approve the Third Amendment to the professional consultant agreement with Stantec Architecture, Inc., (Stantec) to redesign the 65 percent electric bus charging infrastructure design documents to accommodate primary electrical service through PG&E EV Fleet Program in the amount of $73,987 and authorize the Director of Transportation or designee to execute all related documents. EXECUTIVE SUMMARY The Department of Transportation (FAX) seeks the approval of a Third Amendment to an Agreement with Stantec to redesign 65 percent design development drawings to coordinate with PG&E new electric vehicle readiness program, EV Fleet. This program will provide 12KV primary electrical utility service to the FAX bus yard to support the Electric Bus Charging Project. This program enables PG&E to upgrade utility infrastructure to support the FAX electric bus charging needs at no cost to FAX. The additional costs for professional engineering services is offset by the substantial savings resulting in eliminating infrastructure costs and rebates offered by PG&E to purchase electric bus charging equipment and transit vehicles. This scope change has been requested by FAX due to the immediate overall project savings and the long term benefits offered by the PG&E EV Fleet Program. BACKGROUND FAX entered into a consultant agreement with Stantec on April 19, 2018, to provide design and engineering services for the Facilities Improvement Project. The scope of the project covers improvements being made to the existing Bus facilities located at 2223 G Street. Such improvements include upgrades to the fire alarm system, new fare collection building, expansion of the existing bus wash area, replacement of end-of-life bus cleaning equipment, bus entry gate reconfiguration, electric bus charging infrastructure, and redesign of the employee parking area. These improvements are all intended to make the facilities safer and provide better service to customers. The Electric Bus Charging Project will provide FAX with the ability to charge up to 23 zero emission electric buses simultaneously and is intended to support FAX electric bus fleet charging needs over the next ten (10) years. Through the PG&E EV Fleet Program, the utility will provide 3MW of primary electrical service at no cost to FAX. This program was launched after the bus charging infrastructure 65 percent design documents were completed and design was based upon fewer bus chargers and secondary electrical service (lower voltage) from PG&E. The additional costs of Stantec professional engineering services is offset by the substantial savings by eliminating infrastructure costs from the project budget and the rebates offered by the EV Fleet Program to purchase electric bus charging equipment and transit vehicles. Overall, this change will result in a significant cost savings to the project. Additionally, changing to primary electrical service will enable FAX to reasonably expand the zero emission electric bus fleet beyond 23 vehicles in future projects. In November 2018, Council approved the First Amendment to provide additional design and engineering services necessary to replace the FAX Administration Building HVAC equipment and expand network and security requirements. In August 2019, Council approved the Second Amendment to separate the HVAC equipment replacement as a stand-alone construction project. The City Attorney has reviewed the Amendment and approved it as to form. ENVIRONMENTAL FINDING This is not a "project" for the purpose of CEQA pursuant to CEQA Guidelines Section 15378. LOCAL PREFERENCE Local preference was not considered as this is an Amendment being sought for an existing contract. FISCAL IMPACT No general fund dollar will be utilized to fund this Amendment. This Amendment will be funded from State Prop1b PTIMSEA, FTA 5339 and FTA 5307 grants. Attachment: Third Amendment to Stantec Architecture Agreement

Txhawb nqa

Keeb kwm

Hnub timLub cevKev uaKev tshwm sim
Thu, Nov 7, 2019City CouncilAPPROVED

Cov ntawv txuas