Actions pertaining to the Shaw Avenue Paving Fruit to West Avenues project (Bid File No. 12700118) (Council Districts 1 and 2) 1. Adopt a finding of Categorical Exemption, pursuant to Section 15301, Existing Facilities (Class 1) and to Section 15302, Replacement or Reconstruction (Class 2) of the California Environmental Quality Act (CEQA) Guidelines 2. Award a Construction Contract to Agee Construction Corporation of Clovis, California in the amount of $1,209,902

26-1523 · Action Item · Agenda Ready

Introduced by
City Council
Date
Thu, Dec 3, 2026

Full textv1

REPORT TO THE CITY COUNCIL FROM: NICHOLAS D. MASCIA, PE, Assistant City Manager Interim Director, Capital Projects Department BRIAN E. RUSSELL, Director Public Works Department BY: SCOTT P. SEHM, PE, Assistant Director Capital Projects Department, Design Services Division ISAAC CAMPOS, Project Manager Capital Projects Department, Design Services Division SUBJECT ..Title Actions pertaining to the Shaw Avenue Paving Fruit to West Avenues project (Bid File No. 12700118) (Council Districts 1 and 2) Adopt a finding of Categorical Exemption, pursuant to Section 15301, Existing Facilities (Class 1) and to Section 15302, Replacement or Reconstruction (Class 2) of the California Environmental Quality Act (CEQA) Guidelines Award a Construction Contract to Agee Construction Corporation of Clovis, California in the amount of $1,209,902 ..Body RECOMMENDATIONS Staff recommends the City Council 1) adopt a finding of Categorical Exemption pursuant to Section 15301, Existing Facilities (Class 1) and Section 15302, Replacement or Reconstruction (Class 2), of the California Environmental Quality Act (CEQA) Guidelines, and 2) award a construction contract to Agee Construction Corporation of Clovis, California in the amount of $1,209,902 as the lowest responsive and responsible bidder and authorize the Capital Projects Director to sign the construction contract on behalf of the City of Fresno. EXECUTIVE SUMMARY The City of Fresno Public Works Department has identified the need for pavement rehabilitation along a 0.5-mile segment of Shaw Avenue between Fruit Avenue and West Avenue in Council Districts 1 and 2. Shaw Avenue is a heavily traveled arterial road in a developed portion of the City, and the existing pavement has deteriorated to a condition requiring rehabilitation to prevent further structural failure and avoid significantly higher future reconstruction costs. To address these issues, the project scope includes pavement restoration (grind and overlay, with full-depth reconstruction where needed), reconstruction of non-ADA-compliant curb ramps, traffic loop replacement, median nose adjustments, and updated signage and striping. The project is federally funded through a Surface Transportation Block Grant (STBG), with the required local match provided by Measure C Street Maintenance program funds. Nine (9) sealed bids were received and publicly opened on October 6, 2026, ranging from $1,209,902.00 to $2,244,475.95. Agee Construction Corporation of Clovis, California, submitted the lowest responsive and responsible bid of $1,209,902, which is approximately 27% below the Engineer's Estimate of $1,653,427. Approval of this contract will enable the project to move into the construction phase, with construction anticipated to begin in early Spring 2027. BACKGROUND The City of Fresno Public Works Department identified the need for pavement rehabilitation along a 0.5-mile segment of Shaw Avenue between Fruit Avenue and West Avenue. Shaw Avenue is a major arterial roadway serving Council Districts 1 and 2 in a developed portion of the city. The existing pavement has deteriorated due to age, traffic loading, and deferred maintenance, resulting in conditions that warrant rehabilitation to restore roadway performance and extend its service life. Timely pavement rehabilitation is a cost-effective asset management strategy that preserves roadway infrastructure and helps avoid the more extensive and costly repairs associated with continued deterioration and eventual reconstruction. The current Pavement Condition Index (PCI) score for this segment is 41, which corresponds to a poor to very poor pavement condition. This project is one of three projects that will rehabilitate Shaw Avenue between Marks Avenue and Palm Avenue; Marks Avenue to West Avenue, and Fruit Avenue to Palm Avenue are currently in construction. In October 2023, the City applied for STBG funds to encompass the design and construction support services for the Shaw Avenue Paving Project and was included in the Public Works Department’s Fiscal Year 24/25 budget. The project was designed and managed by staff from the Capital Projects Department, Design Services Division. Design work commenced in October 2024 and took approximately 23 months to complete. The project scope includes rehabilitation of existing pavement and replacement of failing segments to optimal conditions along Shaw Avenue between Fruit Avenue and West Avenue through a grind and overlay approach with full-depth reconstruction where needed; reconstruction of non-ADA-compliant curb ramps; installation of curbs and gutters; median nose adjustments; replacement of vehicle detection loops; and updated signage and striping. To accommodate ADA-compliant pedestrian improvements the project required partial right-of-way acquisition from one parcel (APN 417-270-25), a Temporary Construction Easement from one parcel (APN 425-022-11), and a Licensed Right of Entry from one parcel (APN 417-270-38). All right-of-way work was performed by staff from the Capital Projects Department and has been completed. The Notice Inviting Bids for the project's construction contract was published in the Fresno Business Journal and posted on the City's website on September 4, 2026. Nine (9) sealed bid proposals were received and opened at a public bid opening on October 6, 2026, with bids ranging from $1,209,902.00 to $2,244,475.95. Agee Construction Corporation of Clovis, California, is deemed the lowest responsive and responsible bidder. Their bid of $1,209,902 is approximately 27% below the Engineer's Estimate of $1,653,427. The bids will expire on December 9, 2026, sixty-four (64) days after the bid opening. If the bids are rejected or expire, the project will be rebid, resulting in a delay of approximately three (3) months. The Community Workforce Agreement (CWA), adopted by City Council on September 29, 2021, does not apply to this contract. This project is federally funded through the STBG program, and the Federal Highway Administration (FHWA) suspended approval of Project Labor Agreements (PLAs) on federally funded projects in 2025. Accordingly, the PLA requirement is not applicable to this contract. Staff recommends the City Council (1) adopt a finding of Categorical Exemption pursuant to Section 15301, Existing Facilities (Class 1) and Section 15302, Replacement or Reconstruction (Class 2), of the California Environmental Quality Act (CEQA) Guidelines, and (2) award a construction contract for the Shaw Avenue Paving Fruit to West Avenues to Agee Construction Corporation of Clovis, California in the amount of $1,209,902 as the lowest responsive and responsible bidder; and to authorize the Capital Projects Director to sign and execute the construction contract on behalf of the City of Fresno. The City Attorney’s Office has reviewed and approved the Environmental Assessment and the Standardized Construction Contract as to form. ENVIRONMENTAL FINDINGS Staff conducted a preliminary environmental review of the project and determined that it qualifies for Categorical Exemptions under CEQA Guidelines Sections 15301/Class 1 (Existing Facilities) and 15302/Class 2 (Replacement or Reconstruction). The proposed project is limited to the rehabilitation of existing pavement and replacement of failing segments to optimal conditions along an existing 0.5-mile roadway segment in a developed portion of the City, and reconstruction of curb ramps to meet ADA requirements. These improvements do not represent an expansion of use and will enhance the public right-of-way without increasing roadway capacity. Based on the environmental assessment, it was determined that no adverse environmental impacts would occur because the proposed project is exempt under Section 15301/Class 1 and Section 15302/Class 2 of the CEQA Guidelines, and none of the exceptions to the Categorical Exemptions set forth in Section 15300.2 of the CEQA Guidelines apply. LOCAL PREFERENCE Local preference was not implemented for this project because this project is federally funded, which precludes local preference. FISCAL IMPACT The Shaw Avenue Paving from Fruit to West Avenues project is in City Council Districts 1 and 2. The overall cost of the project is $1,777,301. The project is federally funded via a grant through the Surface Transportation Block Grant. The required local match is funded by Measure C Street Maintenance program funds. The project will not impact the General Fund. All funds necessary for the contract award are included in the current fiscal year budget as previously adopted by the Council. Attachments: Environmental Assessment No. PW01081 Standardized Construction Contract Procurement Evaluation Form for Bid File No. 12700118 Vicinity Map

Sponsors

History

—

Attachments