Legislation / 26-1541

Actions pertaining to the Sewer Rehabilitation in Clinton, Fruit, McKinley and West Avenues Project (Bid File No. 12700109) (Council Districts 1 and 3) 1. Adopt a finding of Categorical Exemption per staff’s determination, pursuant to Section 15301/Class 1 and Section 15302/Class 2 of the California Environmental Quality Act (CEQA) Guidelines 2. Award a Construction Contract to West Valley Construction Company, Inc. in the amount of $7,975,000, as the lowest responsive and responsible bidder

26-1541 · Action Item · Agenda Ready

Introduced by
City Council
Date
Thu, Dec 3, 2026

Full textv1

REPORT TO THE CITY COUNCIL FROM: NICHOLAS D. MASCIA, PE, Assistant City Manager Interim Director, Capital Projects Department PAUL AMICO, PE, Director Department of Public Utilities BY: CASSIE L. SCHOLZ, PE, Assistant Director Capital Projects Department, Utilities Project Management Division PATRICIA DIEP, Project Manager Capital Projects Department, Utilities Project Management Division SUBJECT ..Title Actions pertaining to the Sewer Rehabilitation in Clinton, Fruit, McKinley and West Avenues Project (Bid File No. 12700109) (Council Districts 1 and 3) Adopt a finding of Categorical Exemption per staff’s determination, pursuant to Section 15301/Class 1 and Section 15302/Class 2 of the California Environmental Quality Act (CEQA) Guidelines Award a Construction Contract to West Valley Construction Company, Inc. in the amount of $7,975,000, as the lowest responsive and responsible bidder ..Body RECOMMENDATIONS Staff recommends that the City Council 1) adopt a finding of Categorical Exemption per staff’s determination, pursuant to Section 15301/Class 1 and 15302/Class 2 of the California Environmental Quality Act (CEQA) Guidelines and 2) award a construction contract to West Valley Construction Company, Inc., of Fresno, California, in the amount of $7,975,000 as the lowest responsive and responsible bidder for the Sewer Rehabilitation in Clinton, Fruit, McKinley and West Avenues Project (Project), and authorize the Capital Projects Director to sign the construction contract on behalf of the City. EXECUTIVE SUMMARY The Capital Projects Department seeks to award a construction contract to West Valley Construction Company, Inc., of Fresno, California, following a competitive bidding process which identified them as the lowest responsive and responsible bidder in the amount of $7,975,000. The project will rehabilitate the sewer system in the neighborhood bound by Clinton, Fruit, McKinley and West Avenues. This sewer system was installed in the 1940’s and 50’s as part of the original neighborhood development and has deteriorated over time. The Project is intended to address structural deficiencies and improve the long-term reliability of the City’s wastewater collection infrastructure. The construction contract will be funded utilizing appropriations adopted in the Fiscal Year 2027 Capital Improvement Budget within the Wastewater Management Division’s Wastewater Operating Fund. BACKGROUND The Department of Public Utilities is responsible for the collection, conveyance, treatment, and reclamation of wastewater generated by the residential, commercial, and industrial sewer customers in the Fresno-Clovis metropolitan area. The Wastewater Collection System Master Plan Update identified sewer mains through the City that were uninspected and susceptible to deterioration. As a result of this effort, the neighborhood bound by Clinton, Fruit, McKinley and West Avenues was identified as a priority for further investigation. This local sewer system was originally installed in the 1940’s and 1950’s as part of the original neighborhood development. Video inspections subsequently performed by City staff identified sewer mains and appurtenances in need of rehabilitation and replacement. The aging system has deteriorated over time, resulting in cracked and leaking pipes, and exposed aggregate in manhole structures. Early intervention to repair this infrastructure corrects structural deficiencies, reduces future repair costs, and extends service life of the existing system, preventing the cost impacts of full replacement. The Project design was initiated through an On-Call Consultant Services Agreement with Blair, Church & Flynn Consulting Engineers, on October 13, 2025. The scope included the preparation of Construction Documents for the rehabilitation of existing 6-inch to 12-inch standard concrete pipe (SCP) and vitrified clay pipe (VCP) using cured-in-place pipe liners; the removal and replacement of existing 6-inch to 12-inch SCP and VCP with polyvinyl chloride (PVC) pipe; the removal and replacement of 30 access structures; the installation of 21 new access structures; and the reinstatement of service laterals. A Notice of Inviting Bids was advertised on Planet Bids and posted on the City’s website on September 29, 2026. The project plans and specifications were distributed to twenty-eight (28) prospective bidders and posted at two (2) building exchanges. Eight (8) electronic bid proposals were received and publicly opened on November 3, 2026, with bid amounts ranging from $7,975,000 to $13,544,057. West Valley Construction Company, Inc., was determined to be the lowest responsive and responsible bidder in the amount of $7,975,000. The bids will expire on January 6, 2027. If the bids are rejected or expire, the Project must be rebid which will result in a delay to the project. This contract is covered by the Community Workforce Agreement (PLA), adopted by Council in September 2021. West Valley Construction Company, Inc., shall become signatory to the PLA by executing the Agreement To Be Bound. Staff recommends Council adopt a finding of Categorical Exemption, pursuant to Section 15301/Class 1 and 15302/Class 2 of the CEQA Guidelines; award a construction contract to West Valley Construction Company, Inc., in the amount of $7,975,000 as the lowest responsive and responsible bidder; and authorize the Capital Projects Director to sign the standardized construction contract on behalf of the City. The City Attorney’s Office has reviewed and approved the construction documents as to form. ENVIRONMENTAL FINDINGS Staff performed a preliminary environmental assessment of this Project and determined that it falls within the Categorical Exemptions set forth in California Environmental Quality Act (CEQA) Guidelines Section 15301/Class 1 and Section 15302/Class 2. Because the Project consists of the repair and replacement of existing wastewater infrastructure, will not substantially increase the capacity of the infrastructure, and will be located in the same location as the existing pipeline, staff has determined that the Project qualifies for exemption from CEQA under CEQA Guidelines Section 15301/Class 1 and Section 15302/Class 2. Furthermore, staff has determined that none of the exceptions to Categorical Exemptions set forth in CEQA Guidelines, Section 15300.2 apply to the Project. Staff recommend that Council, based upon its own independent judgment, adopt a finding of a Categorical Exemption per Staff determination, pursuant to Sections 15301/Class 1 and 15302/Class 2 of the CEQA Guidelines for the Project. LOCAL PREFERENCE West Valley Construction Company, Inc., is a local business as defined by the Fresno Municipal Code Section 4-108. FISCAL IMPACT The Sewer Rehabilitation in Clinton, Fruit, McKinley and West Avenues Project is located in Council Districts 1 and 3. Funding for this Project is included in the Fiscal Year 2027 Capital Improvement Budget within the Wastewater Management Division’s Wastewater Operating Fund, and will have no impact to the General Fund. Attachments: Environmental Assessment Formal Procurement Evaluation Form Standard Contract Vicinity Map Location Map

Sponsors

History

—

Attachments