Approve the Third Amendment to the Consultant Services Agreement with Electrical Power Systems, Inc., of Fresno, California, to increase the total contract by an amount not to exceed $75,154.00, paid on a time and materials basis for a revised total contract amount not to exceed $181,914.00, for the Emergency Backup Generators at the B-Side Switchgear and Headworks Buildings at the Fresno-Clovis Regional Wastewater Reclamation Facility Project. (Council District 3)
- Introduced by
- City Council
- Date
- Thu, Dec 3, 2026
Full textv1
REPORT TO THE CITY COUNCIL
FROM: NICHOLAS D. MASCIA, PE, Assistant City Manager
Interim-Director, Capital Projects Department
PAUL AMICO, PE, Director
Department of Public Utilities
BY: CASSIE L. SCHOLZ, PE, Assistant Director
Capital Projects Department, Utilities Project Management Division
SAMUEL C. NADORES, Licensed Professional Engineer
Capital Projects Department, Utilities Project Management Division
SUBJECT
..Title
Approve the Third Amendment to the Consultant Services Agreement with Electrical Power Systems, Inc., of Fresno, California, to increase the total contract by an amount not to exceed $75,154.00, paid on a time and materials basis for a revised total contract amount not to exceed $181,914.00, for the Emergency Backup Generators at the B-Side Switchgear and Headworks Buildings at the Fresno-Clovis Regional Wastewater Reclamation Facility Project. (Council District 3)
..Body
RECOMMENDATION
Staff recommends the City Council approve the Third Amendment to the Consultant Services Agreement with Electrical Power Systems, Inc., to increase the total contract amount by an amount of $75,154, for a revised total contract amount not to exceed $181,914, for the Emergency Backup Generators at the B-Side and Headworks Buildings at the Fresno-Clovis Regional Wastewater Reclamation Facility Project; and authorize the Capital Projects Director to sign and execute all documents on behalf of the City.
EXECUTIVE SUMMARY
The Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF) is a critical facility that must continue receiving power during electricity outages. On March 2, 2022, the City approved a Consultant Services Agreement (Agreement) with Electrical Power Systems, Inc. (Consultant) to provide engineering design services for the design of the Emergency Backup Generators at the B-Side and Headworks Buildings at the RWRF Project (Project). The Department of Public Utilities selected natural gas generators as the most reliable source of backup power for the site, and purchased three (3) 2,500 kW natural gas emergency generators through a cooperative purchase agreement with Caterpillar. On June 4, 2026, a Construction Contract was awarded to Dawson Mauldin, LLC for installation of the generators and all required connections and appurtenances.
Staff now recommends approval of the Third Amendment to the Agreement to include engineering services for modifications to the existing electrical switchgear and additional funding for construction administration services. The Third Amendment to the Agreement will be funded utilizing appropriations included in the Fiscal Year 2027 Capital Improvement Budget within the Wastewater Management Division’s Wastewater Operating Fund.
BACKGROUND
The Department of Public Utilities (DPU) is responsible for the collection, conveyance, treatment, and reclamation of wastewater generated by the residential, commercial, and industrial sewer customers in the Fresno-Clovis metropolitan area. As wastewater reclamation is considered a vital public service, the RWRF has been placed on the Block 50 exemption list by Pacific Gas & Electric Company (PG&E). This means the RWRF is recognized as a critical facility that must continue receiving power even during planned electricity outages. Other facilities commonly on the Block 50 exemption list include: fire and police stations, acute care hospitals, communication utilities, radio and TV emergency broadcasting stations, electric utility facilities, fuel transportation, and water treatment facilities. However, placement on the list is only temporary, and DPU must ultimately install backup generators that can adequately support critical loads.
The RWRF’s current electrical power system is fed from 70 kV PG&E transmission lines, the energy from which is converted to 12 kV by City-owned 10 MVA substations. If a substation or feeder fails, the other substation would provide all plant power through a tie breaker. If a transmission or both substations are down, an alternate PG&E 12 kV feeder can be brought in through a 12 kV breaker at the RWRF. The established peak hourly demand at the RWRF is 7.2 MW. If power becomes completely unavailable, the emergency generator system would need to serve this demand.
On March 2, 2022, the City and the Consultant entered into an agreement for an amount not to exceed $49,450, for professional engineering services for the design of the Project. This included sizing backup generators to support the critical loads at the RWRF for the peak hourly demand, and the design of all required connections and appurtenances, existing switchgear modifications for automatic transfer switch control, gas supply pipeline, preparation of an operations plan, and assistance with the initial startup.
To meet the RWRF’s 7.2 MW peak hourly demand, DPU purchased three (3) 2,500 kW natural gas emergency generators with a total 7.5 MW capacity through a cooperative purchase agreement with Caterpillar. DPU evaluated both diesel and natural gas generators and selected natural gas primarily due to the availability and reliability of the fuel supply. Natural gas was preferred to diesel due to potential diesel supply shortages caused by the widespread use of diesel fueled generators during prolonged power outages. For natural gas generators, there are three (3) possible fuel supply sources: (1) PG&E natural gas lines, (2) liquified natural gas that may be delivered via a tanker truck, and (3) future renewable natural gas generated at the RWRF.
On March 31, 2025, the First Amendment to the Agreement was executed to increase the total contract by an amount not to exceed $57,310, paid on a time and materials basis, increasing the total contract to an amount not to exceed $106,760. On August 14, 2025, the Second Amendment to the Agreement was executed to replace YCG Civil Engineering with OMNI Design Group, Inc., as the subconsultant for grading design without changing the overall compensation or term of the Agreement. On June 4, 2026, a Construction Contract was awarded to Dawson Mauldin, LLC for installation of the generators and all required connections and appurtenances.
Staff now recommends approval of the Third Amendment to the Agreement to increase the total contract by an amount of $75,154, increasing the total contract to an amount not to exceed $181,914, paid on a time and materials basis; and authorization of the Capital Projects Director to sign the Third Amendment on behalf of the City. This Third Amendment will include engineering services for modifications to the existing medium-voltage switchgear and related protection control systems, and additional funding for construction administration for the installation of the new emergency generators.
The City Attorney’s Office has reviewed and approved the proposed Amendment as to form.
ENVIRONMENTAL FINDINGS
Staff has previously determined that the Project is categorically exempt from the requirements of CEQA pursuant to Sections 15301/Class 1 (a) and (b) (Existing Facilities) Categorical Exemptions set forth in the CEQA Guidelines. Furthermore, none of the exceptions to Categorical Exemptions set forth in the CEQA Guidelines, Section 15300.2 apply to this Project. Council Adopted the findings of Categorical Exemption on June 4, 2026.
LOCAL PREFERENCE
Local preference does not apply to this action because this is an amendment to an existing consultant services agreement.
FISCAL IMPACT
The proposed Project is located in Council District 3 and has no impact to the General Fund. Funding for this Project is included in the Fiscal Year 2027 Capital Improvement Budget within the Wastewater Management Division’s Wastewater Operating Fund.
Attachments:
Third Amendment to Agreement
Second Amendment to Agreement
First Amendment to Agreement
Original Consultant Agreement-Supplemental
Vicinity Map
Location Map
Sponsors
- Capital Projects Department
- Department of Public Utilities
History
Attachments
- 26-1545 Third Amendment_to_the_Agreement.pdfuntagged
- 26-1545 Second Amendment to Agreementscanned_image
- 26-1545 First Amendment to Agreement.pdfscanned_image
- 26-1545 Original Consultant Agreement-Supplementaluntagged
- 26-1545 Vicinity Maptagged
- 26-1545 Location Maptagged