Legislation / 26-1547

Approve the Second Amendment to the Consultant Services Agreement with Mark Thomas & Company, Inc., a California Corporation, of Fresno, California, in the amount of $29,460.00 for a total contract amount not to exceed $260,060, to provide additional civil engineering design, bidding, and construction support services for the Ashlan Avenue Widening Project between Polk Avenue and Cornelia Avenue (Council District 1)

26-1547 · Action Item · Agenda Ready

Introduced by
City Council
Date
Thu, Dec 3, 2026

Full textv1

REPORT TO THE CITY COUNCIL FROM: NICHOLAS D. MASCIA, P.E., Assistant City Manager Interim Director, Capital Projects Department BRIAN E. RUSSELL, Director Department of Public Works BY: SCOTT P. SEHM, P.E., Assistant Director Capital Projects Department, Design Services Division ADAM B. LEE, P.E., Project Manager Capital Projects Department, Design Services Division SUBJECT ..Title Approve the Second Amendment to the Consultant Services Agreement with Mark Thomas & Company, Inc., a California Corporation, of Fresno, California, in the amount of $29,460.00 for a total contract amount not to exceed $260,060, to provide additional civil engineering design, bidding, and construction support services for the Ashlan Avenue Widening Project between Polk Avenue and Cornelia Avenue (Council District 1) ..Body RECOMMENDATIONS Staff recommends that the City Council approve the Second Amendment to the Consultant Services Agreement with Mark Thomas & Company, Inc., in the amount of $29,460 for a total contract amount not to exceed $260,060, for additional civil engineering design services and preparation of final construction documents necessary to complete the design phase of the Ashlan Avenue Widening Project between Polk Avenue and Cornelia Avenue; and authorize the Capital Projects Director to sign the Amendment on behalf of the City of Fresno. EXECUTIVE SUMMARY Mark Thomas & Company, Inc. (Consultant) has completed the contractual scope of work under the Consultant Services Agreement dated March 16, 2020, for professional engineering services for the Ashlan Avenue Widening Project between Polk Avenue and Cornelia Avenue (Project ID: PW00891). Subsequent to the Consultant's completion of the construction documents, field conditions and right-of-way (ROW) constraints necessitate out-of-scope modifications to the construction documents including changes at the southeast corner of Ashlan Avenue and North Polk Avenue where revisions are needed to conform the proposed widening work to existing site conditions, as the intersection is not yet ready for development; the proposed eastbound left-turn pocket at Dante Avenue must be removed from the plans, and a hot-mix asphalt (HMA) dike barricade must be added at that location due to the City's inability to secure the necessary ROW; the City provided supplemental review comments related to driveway modifications along the corridor that constitute additional out-of-scope effort for the Consultant. To address these required modifications, staff recommends City Council approval of a Second Amendment to the Consultant Services Agreement with the Consultant in the amount of $29,460, to allow these needed revisions to the construction documents and provide bidding and construction support services associated with the revised design work. The Project is funded by Surface Transportation Block Grant (STBG) funds and New Growth Developer Fees, and approval of this Second Amendment will have no impact on the General Fund. BACKGROUND Existing conditions on Ashlan Avenue between North Polk Avenue and North Cornelia Avenue include one lane in each direction with a striped center divide, which is unpaved. There are no bike lanes and limited sidewalks along eastbound Ashlan from Dante Avenue to 150 feet east of Dante, and from Cornelia Avenue to approximately 483 feet west of Cornelia. The intersection of Ashlan Avenue and North Polk Avenue is an all-way stop; however, residential subdivisions in the area have been conditioned to install a traffic signal at that location. Eastbound Ashlan widens to two lanes with a dedicated left-turn pocket at the intersection of Ashlan Avenue and Cornelia Avenue. Single-family homes on large lots line both sides of Ashlan along this approximately one-half mile stretch. The City of Fresno Public Works Department has identified a need for the Ashlan Avenue Widening between Polk Avenue and Cornelia Avenue. The Ashlan Avenue Complete Streets project will widen eastbound Ashlan Avenue between Polk Avenue and Cornelia Avenue from one lane to two lanes, install sidewalk, Class II bike lanes, and a raised median on eastbound Ashlan. It will also include new streetlights, curb, gutter, curb ramps, power pole relocation, new signal loops, and a new storm drain inlet to be connected to existing facilities. On March 16, 2020, the City entered into a Consultant Services Agreement with Mark Thomas & Company, Inc. (Consultant) to provide professional civil engineering design services and prepare construction documents for the Ashlan Avenue Widening Project between Polk Avenue and Cornelia Avenue, for a total fee of $192,338 with a $10,000 contingency. The project is funded by Surface Transportation Block Grant (STBG) funds and New Growth Developer Fees and will have no impact on the General Fund. On February 13, 2025, the City Council approved the First Amendment to the Consultant Services Agreement with the Consultant in the amount of $38,262, for a total contract value of $230,600. One parcel requiring right-of-way acquisition was revised from a full acquisition to a partial acquisition at the property owner's request, necessitating the redesign of a portion of the project adjacent to the parcel and the engineering design of a new driveway approach and retaining wall to maintain safe access into the property. The Consultant has completed the contractual scope of work related to preparation of the construction documents for the project. However, three field conditions have arisen that require out-of-scope revisions to the final plans. First, because the intersection of Ashlan Avenue and North Polk Avenue is not yet ready for development, the City has requested revisions to the final plans at the southeast corner of that intersection to conform the proposed widening work to the site conditions currently existing at that location. Second, due to the City's inability to secure needed right-of-way prior to grant deadlines for construction authorization, the Consultant was asked to remove the proposed eastbound left-turn pocket at Dante Avenue from the plans and to add a hot-mix asphalt (HMA) dike barricade at that location. Third, the City provided supplemental review comments related to driveway modifications along the corridor that will result in additional out-of-scope effort for the Consultant. To address these modifications to the plans and specifications, the City seeks to amend the Consultant Services Agreement so the Consultant can make the required revisions and provide bidding and construction support services related to the revised design work. Staff recommends that the City Council approve the Second Amendment to the Consultant Services Agreement with Mark Thomas & Company, Inc., in the amount of $29,460, to finalize the construction documents for the Ashlan Avenue Widening Project between Polk Avenue and Cornelia Avenue. The project is funded by STBG funds and New Growth Developer Fees and will have no impact on the General Fund. Previous and proposed consultant service agreement amendments are summarized in the table below. Amendment No. City Council Approval Amendment Amount Cumulative Contract Value Reason / Purpose 1 February 13, 2025 $38,262 $230,600 Unforeseen Conditions, City Request ROW scope change for one parcel from full to partial acquisition necessitating redesign of adjacent project area and design of a new residential driveway approach and retaining wall. 2 Pending Council Approval $29,460 $260,060 Unforeseen Conditions, City Request Revisions to final plans at the southeast corner of Ashlan Avenue and North Polk Avenue; removal of proposed eastbound left-turn pocket at Dante Avenue and addition of an HMA dike barricade; driveway modifications along the corridor. The City Attorney’s Office has reviewed and approved the Second Amendment as to form. ENVIRONMENTAL FINDINGS By the definition provided in the California Environmental Quality Act (CEQA) guidelines, this item is not a project as defined by CEQA. LOCAL PREFERENCE Local preference was not considered because this item does not include a bid for or award of a construction or services contract. FISCAL IMPACT This project is in Fresno City Council District 1. The design phase is funded through New Growth Developer Impact Fees and will not impact on the General Fund. The rightofway and construction phases are anticipated to be funded by Surface Transportation Block Grant (STBG) funds. Appropriations for this agreement are included in the current fiscal year budget as previously adopted by the City Council. Attachments: Second Amendment to the CSA First Amendment to the CSA Executed Consultant Services Agreement Executed Vicinity Map

Sponsors

History

—

Attachments

26-1547 — Approve the Second Amendment to the Consultant Services Agreement with Mark Thomas & Company, Inc., a California Corpora